Reconstruction of local road v.Gabrevci

Active
Budget

2814009.00mkd

Length

129,0m

Width of asphalt road

3,0m

Haunching two sides

2 x 50cm

With this sub-project is planned reconstruction of the existing asphalt road.

With the reconstruction are planned the next activities:

  1. Marking the route of new planned sub – project
  2. Removing the existing damaged asphalt road, the existing base course and part of the subgrade.
  3. Leveling, planning and compacting the subgrade until needed.
  4. Leveling and compacting the base course with crushed stone until needed
  5. Constructing predicted layers of asphalt
    1. Bituminized asphalt layer BNS 16 – 8,0 sm
  6. Constructing concrete access culvert.
  7. Mapping with horizontal and vertical signalization