Local street “Jane Sandanski” in the town of Demir Kapija

Active
Budget

4218307.5mkd

Тhe street “Jane Sandanski” is located in the southern part of the city of Demir Kapija. On the northwest and southeast sides, the street merges with existing asphalt streets. The width of the street “Jane Sandanski” is variable and does not meet the criteria for unobstructed vehicle flow and traffic safety. The current condition of the project street is characterized by a dirt road with various visible damages, formed by two arms.

According to the Basic Design, it is planned to lay new asphalt with a width of 5.5m and sidewalks on both sides of the first leg of the street. The second leg is a continuation of the first leg and is planned to be a pedestrian path.
The drainage of the streets is through longitudinal slopes along the entire length of the street. On both sides of the project street “Jane Sandanski” there are only individual houses.

The basic design elements of the street are:

  • LEG 2: walking path with variable width ~2.7m
  • It is planned to lay new asphalt BHNS16-7cm and install large
  • Curbs (18x10x24) on both sides of the roadway on Leg 1 as well as small curbs
  • (8×20) along Leg 2 and the newly designed sidewalks
  • Leg 2 is a pedestrian path made of paver elements (8x10x20cm)
  • Sidewalks are planned along the entire roadway on both sides of the roadway. On the right side, the sidewalk has a variable width (130-270cm) – which is conditioned from the construction plots in the urban plan. The sidewalk on the left side of the roadway is planned with a constant width of 200 cm

The local road is part of T7D4.Total amount for reconstruction of this project is 4218307.5 denars.

Gallery

4

01-01-1970

3

01-01-1970

2

01-01-1970

1

01-01-1970

Situation

Before the start of construction works
https://www.mapillary.com/app/?pKey=222139196544492&lat=41.407680681909284&lng=22.243612963177156&z=17.4542365642045
After completion of construction works

GRIEVANCE REDRESS MECHANISM