Active
Width of asphalt road
4,5m - 7,5m
Sidewalk (two sided)
W=1,0m -2,0m
With this sub-project is planned reconstruction of the existing asphalt road and the sidewalks
With the reconstruction are planned the next activities:
- Marking the route of new planned sub – project
- Scratching the existing layer of asphalt
- Leveling, planning and compacting the subgrade until needed.
- Leveling and compacting the base course with crushed stone until needed
- Constructing predicted layers of asphalt
- Bituminized asphalt layer BNS 16 -7sm
- Spraying with bituminized emulsion in between the layers.
- Installing curb/edge concrete elements
- Reconstructing the existing sidewalk with paver elements.
- Leveling the existing manholes, constructing surface channel, pipes for drainage the storm water to the recipient
- Mapping with horizontal and vertical signalization
- Electrical installations (according to project for electrical installations)