Reconstruction of part of Street 4 and Street 14 in v.Krusheani

Active
Budget

9044566mkd

Length

St. “4” - 172,0m, St. “14” - 169,0m

Street “4” - Width

6,5m

Sidewalk (two sides)

2 x 1,5m


Street “14” - Width

5,5m

Sidewalk (two sided)

2 x 1,5m

With this sub-project is planned reconstruction of the existing dirt road and constructing new sidewalks.

With the reconstruction are planned the next activities:

  1. Marking the route of new planned sub – project
  2. Removing the existing dirt layer, the existing base course and part of the subgrade.
  3. Leveling, planning and compacting the subgrade until needed.
  4. Leveling and compacting the base course with crushed stone until needed.
  5. Constructing predicted layers of asphalt
    1. Bituminized asphalt layer BNS 16-7,0sm
    2. Layer of AB 11 – 4,0sm
  6. Installing curb/edge concrete elements
  7. Leveling the existing manholes and constructing new manholes and channels for drainage of storm wather.
  8. Constructing sidewalks with paver elements.
  9. Installing pipes for fiber optic cable.
  10. Mapping with horizontal and vertical signalization.

Gallery

Situation

Before the start of construction works
After completion of construction works