Active
Width of asphalt road
2х3,25m
With this sub-project is planned reconstruction of the existing asphalt road, the sidewalks and construction a parking place and new bike path. With the reconstruction are planned the next activities:
- Marking the route of new planned sub – project
- Removing the existing damaged asphalt road, the existing base course and part of the subgrade.
- Leveling, planning and compacting the subgrade until needed.
- Leveling and compacting the base course with crushed stone until needed
- Constructing one layer of asphalt and granite blocks
- Bituminized asphalt layer BNS 16-7,0sm
- Granit blocks 10/10
- Spraying with bituminized emulsion in between the layers.
- Installing curb/edge concrete elements
- Leveling the existing manholes and constructing new manholes and channels for drainage of storm water.
- Constructing sidewalk with granite blocks.
- Constructing bike path with granite blocks.
- Electrical installations
- Mapping with horizontal and vertical signalization.