Construction of Local Road: Prnalija – Supurge

Active
Budget

19126960.5mkd

Length

2,902.00m

Width of asphalt road

4,0m

With this sub-project is planned reconstruction of the existing dirt road. With the reconstruction are planned the next activities:

  1. Marking the route of the new planned sub – project.
  2. Removing the existing dirt layer.
  3. Leveling, planning and compacting the subgrade until needed.
  4. Leveling and compacting the base course with crushed stone until needed.
  5. Constructing one layer of asphalt:
    •  wearing course
  6. Installing pipes for optical cable.
  7. Constructing surface earth channels and access culvert for drainage the storm water to the recipient.

Gallery

IMG-d7994db6d84f185eff919ea44224e38c-V

23-08-2021

IMG-d0e438648df5ba90b52db1ff8bfe0860-V

23-08-2021

IMG-501200404362bd4611955d00c6ffbac9-V

23-08-2021

IMG-623314098d8e39a8d3b512bce737818e-V

27-08-2021

IMG-39719263aa8d2891676a2bf69253aa4b-V

08-08-2021

IMG-4411139b8b9a527ff4fbe452a30dd580-V

23-07-2021

IMG-9882f1fe890ca37efd2cd2dacb3c7b7b-V

09-07-2021

IMG-537b3d534debe3715acf65030bbd6064-V

21-07-2021

IMG-84d367a426796578445b4d0ce083243d-V

09-07-2021

IMG-81d59fed3dca9eeee5b46e0a2f358d3b-V

03-07-2021

IMG-65a7757bf20242d8c63fbc8689107950-V

01-01-1970

IMG-9ab35d708ae7920fc009351466b04658-V

07-08-2021

IMG-09c587226606a7fb92a00667cf91c260-V

23-06-2021

IMG-8f4b6051168d8314b89f578a20362bc3-V

08-07-2021

IMG-5df936f61921bbf562301cdd486e1647-V

01-01-1970

Situation

Before the start of construction works
After completion of construction works

GRIEVANCE REDRESS MECHANISM

file a complaint