Active
Width of asphalt road
3,0m
Haunching two sides
2 x 50cm
With this sub-project is planned reconstruction of the existing asphalt road.
With the reconstruction are planned the next activities:
- Marking the route of new planned sub – project
- Removing the existing damaged asphalt road, the existing base course and part of the subgrade.
- Leveling, planning and compacting the subgrade until needed.
- Leveling and compacting the base course with crushed stone until needed
- Constructing predicted layers of asphalt
- Bituminized asphalt layer BNS 16 – 8,0 sm
- Constructing concrete access culvert.
- Mapping with horizontal and vertical signalization