Active
Width of existing dirt road
4,5m
Sidewalk (two sides)
2 x 1,0m
Width of new planned asphalt road
4,5m
With this sub-project is planned reconstruction of the existing dirt road and constructing new sidewalks.
With the reconstruction are planned the next activities:
- Marking the route of new planned sub – project
- Removing the existing dirt layer, the existing base course and part of the subgrade.
- Leveling, planning and compacting the subgrade until needed.
- Leveling and compacting the base course with crushed stone until needed.
- Constructing predicted layers of asphalt
- Bituminized asphalt layer BNS 16 – 8sm
- Installing curb/edge concrete elements
- Leveling the existing manholes and constructing new where needed.
- Constructing sidewalks with paver elements.
- Installing pipes for fiber optic cable.
- Mapping with horizontal and vertical signalization.