Reconstruction of Local Street: Goce Delcev – Tetovo

Active
Budget

14195155mkd

Length

732.00m

Width of asphalt road

7,5m

Sidewalks (two sides)

2x2,25m

With this sub-project is planned reconstruction of the existing asphalt and existing sidewalks. With the rehabilitation are planned the next activities:

  1. Removing the existing surface course, the existing base course and part of the subgrade, removing the existing sidewalks.
  2. Marking the route from the surveyor from the new planned sub – project.
  3. Leveling, planning and compacting the subgrade until needed.
  4. Leveling and compacting the base course with crushed stone until needed.
  5. Constructing two layers of asphalt:
    • binder course
    • wearing course
  6. Spraying with bituminized emulsion in between the layers.
  7. Installing a curb/edge concrete element.
  8. Reconstruction of the existing sidewalks with paver elements.
  9. Leveling the existing manholes.
  10. Installing pipes for optical cable.
  11. Mapping with horizontal and vertical signalization

Gallery

1

17-09-2021

3

17-09-2021

4

02-07-2021

6

26-08-2021

7

17-08-2021

8

22-08-2021

9

17-09-2021

10

14-07-2021

11

23-08-2021

12

19-10-2021

16

19-10-2021

19

19-10-2021

18

19-10-2021

17

19-10-2021

19

19-10-2021

18

19-10-2021

15

19-10-2021

14

21-10-2021

13

21-10-2021

поставен механизам за жалби и полаки на градилиште

10-07-2021

мерки за безбедност и здравје при работа и поставен мех за жалбипоплаки на градилиште

10-07-2021

Situation

Before the start of construction works
After completion of construction works

GRIEVANCE REDRESS MECHANISM

file a complaint