Reconstruction of street Edvard Kardelj

Active
Budget

6790690mkd

Length

560.00m

Traffic lane

2x3.0=6.0m

Sidewalks

2 x 1.5m

With this sub-project is planned reconstruction of  the existing asphalt road and  sidewalks. With the reconstruction are planned the next activities:

  1. Removing the existing earth surface.
  2. Marking the route from the surveyor from the new planned sub – project.
  3. Leveling, planning and compacting the subgrade until needed.
  4. Leveling and compacting the base course with crushed stone until needed
  5. Constructing two layer of asphalt
    • binder  course
    • wearing course
  6. Installing a curb/edge concrete elements
  7. Reconstruction of existing sidewalks with paver elements 9. Leveling the existing manholes
  8. Installing pipes for electricity and optical cable
  9. Mapping with horizontal and vertical signalization