Reconstruction of Street “29” in the municipality of Adzimatovo, Municipality of Lozovo

Active
Budget

1243287mkd

Length

131.7

Total road length: L = 131.7 m

  • Design speed: 30 km/h
  • Road profile width: 4.00 m

Pavement Structure

  • BNHS 16 – asphalt layer: d = 7cm

The subject street is part of Т4D5.

The work is being carried out by the construction  DPTU ЕSKAVATORI – MK Dooel Skopje. The value of the signed contract is 1,243,287 denars.

Project Overview

Preparatory work:

  • Securing and marking the route

Lower and upper structure:

  • Mechanical excavation of earth in a wide excavation 3-4 floors.
  • Subsoil / bedding production
  • Embankment preparation (improved bedding 15cm)
  • Leveling of existing manholes with replacement of covers
  • Installation of buffer layer (under the roadway) d=30cm
  • Installation of BNHS 16 layer d=7cm
  • Construction of shoulders 25cm

Traffic signals:

  • Installation of traffic signs

Additional quantities:

  • Concrete curbs 18/24 (on the left side) for gutter
  • One side curb 50cm

Gallery

Picture1

01-01-1970

Picture2

01-01-1970

Picture3

01-01-1970

Picture4

01-01-1970

Picture5

01-01-1970

Situation

Before the start of construction works
https://www.mapillary.com/app/user/stojanpesevski?lat=41.80035959001282&lng=21.941502923062217&z=17.384080823644595&menu=true&pKey=943225769720774&mapStyle=Esri+satellite
After completion of construction works