Total road length: L = 131.7 m
- Design speed: 30 km/h
- Road profile width: 4.00 m
Pavement Structure
- BNHS 16 – asphalt layer: d = 7cm
The subject street is part of Т4D5.
The work is being carried out by the construction DPTU ЕSKAVATORI – MK Dooel Skopje. The value of the signed contract is 1,243,287 denars.
Project Overview
Preparatory work:
- Securing and marking the route
Lower and upper structure:
- Mechanical excavation of earth in a wide excavation 3-4 floors.
- Subsoil / bedding production
- Embankment preparation (improved bedding 15cm)
- Leveling of existing manholes with replacement of covers
- Installation of buffer layer (under the roadway) d=30cm
- Installation of BNHS 16 layer d=7cm
- Construction of shoulders 25cm
Traffic signals:
- Installation of traffic signs
Additional quantities:
- Concrete curbs 18/24 (on the left side) for gutter
- One side curb 50cm