Reconstruction of a Local Road in the village of Moroishta-Municipality of Struga

Total lenght L= 2,466.70m

Design element:

  • Category: Local road
  • Design speed: Vpr= 40 km/h
  • Carriageway nominal width: 5m
  • Pedestrian path: 1.3m
  • Shoulder: Buffer material (d≈30cm)…0.75m at the edge of the carriageway, 0.5m at the parking curb of the pedestrian path
  • Gutter: Asphalt concrete with 0.5+0.12 (curb 18/247)
  • Road platform: Nominal width 0.5m (concrete channels)/0.3m (earthen-trapezoidal)

Alignment solution:

  • The designed axis follows the existing carriageway
  • L=2,466.70 m
  • Rmin= 40.8m, Rsr= 364m
  • Number of curves: 27
  • Elements: Tangent and Circular Curve
  • Distance between profiles: <15m
  • Total lenght in tangent sections: 1,652.6m (67% total lenght)
  • Total lenght in curves: 814.1m )33% of total lenght)

PAVEMENT STRUCTURE:

  • BNHS 16………………………………………d=7cm
  • Buffer layer of crushed aggregate………d=30cm

The route is part of the allocated funds from the Municipality of Struga as part of T3D4.1.

The contractor for the works is the construction company AD Ilinden-Struga.

The project envisaged the reconstruction of the local road passing  through the village of Moroishta, which was severely damaged, lacking proper drainage, pedestrian path and signage.

The construction work included the following activities:

  • Securing and marking the route
  • Topsoil removal
  • Bulk excavation
  • Embankment construction
  • Improved subbase layer construction
  • Buffer material layer construction
  • Concrete curb construction (MB40 18/24) on part of the route
  • Construction of the concrete drainage channels
  • Installation of new culverts and slab crossings
  • Installation of new traffic signage
  • Asphalt paving (BNHS 16, d=7cm)

The value of the signed contract amounts to 752.904 EUR.

The construction work have been successfully completed.