Construction of a street “Osogovska” – Мunicipality of Makedonska Kamenica

Total road length: L = 1200m

  • Design speed: 30 km/h
  • Road profile width: 00m – 7.00m
  • Maximum cross slope:00%
  • Maximum longitudinal slope: 49%

Pavement Structure

  • AB 11 – asphalt layer: d = 5cm

Parts with complete reconstruction:

  • AB 11 – asphalt layer: d = 5cm
  • BNS 22 asphalt layer: d = 7cm
  • Base layer of crushed stone: d = 30cm

The subject street is part of T8D1 and is the only one for implementation in the Municipality of Makedonska Kamenica under this agreement.

The work is being carried out by the construction company “Kole Trans” with “Gradba Promet”.

Project Overview

The project includes the reconstruction of the street.

The construction works include the following tasks:

  • Securing and marking the route
  • Demolition of the standard asphalt from the road d=12cm with loading and transportation to a location or landfill indicated by the Investor-Municipality
  • Scraping (planning) of the existing road
  • Construction of an embankment
  • Mechanical excavation of soil in a wide excavation III and IV category with loading and transportation to a location or landfill indicated by the Investor-Municipality
  • Procurement, transportation and installation of a buffer layer of crushed stone material for the road dmin=30 cm to the required compaction
  • Installation of concrete curbs (MB40 18/24) at certain locations
  • Procurement, transportation and installation of a bitumen emulsion of 0.3-0.5 kg/m2 on a previously cleaned and decontaminated surface
  • Asphalt paving with BNHS 16, d = 7cm
  • Procurement, transport and construction of AB 11C d=5cm

Before the construction, the street, i.e. the road construction, was in poor condition, i.e. there were cracks of the type: crocodile skin, transverse and longitudinal cracks, mesh cracks, potholes, etc.

The value of the signed contract is 6,273,906 denars.

Currently, 100% of the street is completed.

Reconstruction of a local road for the village of Cera, a section from Krapevska maala to Stipcarska maala and a branch to the neighborhood cemetery

With this sub-project is planned reconstruction of the existing asphalt road and sidewalk.

With the reconstruction are planned the next activities:

  1. Marking the route of new planned sub – project
  2. Removing the existing damaged asphalt road, the existing base course and part of the subgrade.
  3. Leveling, planning and compacting the subgrade until needed.
  4. Leveling and compacting the base course with crushed stone until needed.
  5. Constructing predicted layers of asphalt
    1. Bituminized asphalt layer BNS 16A -7sm
  6. Installing curb/edge concrete elements
  7. Constructing concrete access culvert.
  8. Constructing asphalt concrete channel – rigola
  9. Installing pipes for optical cable.

10. Mapping with horizontal and vertical signalization

Reconstruction of a local road for the village of Todorovci – Albanian neighborhood

With this sub-project is planned reconstruction of existing dirt road.

With the reconstruction are planned the next activities:

  1. Removing the existing dirt layer, the existing base course and part of the subgrade.
  2. Marking the route from the surveyor from the new planned sub – project.
  3. Leveling, planning and compacting the subgrade until needed.
  4. Leveling and compacting the base course with crushed stone until needed
  5. Constructing predicted layers of asphalt
    1. Bituminized asphalt layer BNS 22 -7sm
    2. Layer of AB 11 – 4sm
  6. Installing curb/edge concrete elements
  7. Mapping with horizontal and vertical signalization