Local Street Kuzman Shapkarev – Gjorce Petrov

With this sub-project is planned reconstruction of the existing asphalt road, extending the existing sidewalks. With the reconstruction are planned the next activities:

  1. Removing the existing surface course, the existing base course and part of the subgrade and removing the existing sidewalks.
  2. Marking the route of the new planned sub – project.
  3. Leveling, planning and compacting the subgrade until needed.
  4. Leveling and compacting the base course with crushed stone until needed.
  5. Constructing two layers of asphalt:
    • binder course
    • wearing course
  6. Spraying with bituminized emulsion in between the layers.
  7. Installing curb/edge concrete elements.
  8. Constructing new sidewalks, reconstruction and extending the existing ones.
  9. Leveling the existing manholes.
  10. Installing pipes for optical cable.
  11. Mapping with horizontal and vertical signalization.

Local Street Anton Keckarov – Gjorce Petrov

With this sub-project is planned reconstruction of the existing asphalt road. With the reconstruction are planned the next activities:

  1. Removing the existing surface course, the existing base course and part of the subgrade, removing the existing sidewalks.
  2. Marking the route of the new planned sub – project.
  3. Leveling, planning and compacting subgrade until needed.
  4. Leveling and compacting the base course with crushed stone until needed.
  5. Constructing two layers of asphalt:
    • binder course
    • wearing course
  6. Spraying with bituminized emulsion in between the layers.
  7. Leveling the existing manholes.
  8. Mapping with horizontal and vertical signalization