Construction of local road,, Street 4”- Municipality of Sveti Nikole

Active
Budget

2556580mkd

Length

101.08

Total road length: L = 101.08 m

  • Design speed: 30 km/h
  • Road profile width: 50 m
  • Maximum cross slope: 50 %
  • Maximum longitudinal slope: 83%

Pavement Structure

  • BNHS 22 – asphalt layer: d = 7cm
  • Base layer of buffer layer under the roadway: 30cm
  • Base layer of buffer layer under the sidewalks: 20cm

The subject street is part of Т4D5.The work is being carried out by the construction  DPTU ЕSKAVATORI – MK Dooel Skopje. The value of the signed contract is 2,556,580 denars.

Project Overview

Preparatory work:

  • Securing and marking the route
  • Dislocation of existing concrete columns

Lower and upper structure:

  • Mechanical excavation of earth in a wide excavation 3-4 floors.
  • Making a bed
  • Making an embankment
  • Leveling existing manholes
  • Installing a buffer layer (under the roadway)d=30см
  • Installation of concrete curbs18/24
  • Installation of buffer layer (under sidewalks) d=20см.
  • Installation of BNS22 layer d=7см.
  • Installation of AB11 layer d=5см.
  • Installation of sidewalk concrete curbs 6/20
  • Installation of paver elements on sidewalks

Drainage:

  • Installation of drainage pipes f150 (with excavation, filter material and backfilling
  • Procurement and installation of street drains
  • Production of absorption wells (4 pcs.)

Traffic signals:

  • Installation of traffic signs
  • Marking of horizontal signaling

Additional quantities:

  • Construction of an embankment, with procurement of the material (improved bedding)
  • Procurement and installation of iron manhole covers

Gallery

Picture1

01-01-1970

Situation

Before the start of construction works
https://www.mapillary.com/app/user/elizabettak?lat=41.87169003190297&lng=21.931810523148215&z=17.01755819584751&menu=true&pKey=988422771966181&focus=map
After completion of construction works

GRIEVANCE REDRESS MECHANISM

file a complaint