Reconstruction of street JNA

Active
Budget

10251060mkd

Length

765.00m

Width of asphalt road

6,0m

Sidewalks (two sides)

2 x 1,5m

With this sub-project is planned reconstruction of the existing asphalt road and sidewalks

With the reconstruction are planned the next activities:

  1. Marking the route of new planned sub – project
  2. Removing the existing damaged asphalt road, the existing base course and part of the subgrade.
  3. Leveling, planning and compacting the subgrade until needed.
  4. Leveling and compacting the base course with crushed stone until needed
  5. Constructing predicted layers of asphalt
    1. Bituminized asphalt layer BNS 16 -7sm
  6. Installing curb/edge concrete elements
  7. Constructing sidewalks with paver elements.
  8. Leveling the existing manholes
  9. Mapping with horizontal and vertical signalization.

Gallery

ул.ЈНА_3

25-10-2021

ул.ЈНА_2

25-10-2021

ул.ЈНА_1

25-10-2021

ул.ЈНА Неготино

25-10-2021

ул.ЈНА Неготино 1

25-10-2021

Ул.ЈНА Неготно

10-10-2021

ул.ЈНА Крак 2 Неготино

10-10-2021

IMG-713bceb354e86bb5734bd6dbcfc82ed9-V

10-10-2021

Situation

Before the start of construction works
After completion of construction works

Documents

GRIEVANCE REDRESS MECHANISM

file a complaint