Active
Width of asphalt road
6,0m
Sidewalks (two sides)
2 x 1,5m
With this sub-project is planned reconstruction of the existing asphalt road and sidewalks
With the reconstruction are planned the next activities:
- Marking the route of new planned sub – project
- Removing the existing damaged asphalt road, the existing base course and part of the subgrade.
- Leveling, planning and compacting the subgrade until needed.
- Leveling and compacting the base course with crushed stone until needed
- Constructing predicted layers of asphalt
- Bituminized asphalt layer BNS 16 -7sm
- Installing curb/edge concrete elements
- Constructing sidewalks with paver elements.
- Leveling the existing manholes
- Mapping with horizontal and vertical signalization.