Total road length: L = 252 m
- Design speed: 30 km/h
- Road profile width: 3.50 m
Pavement Structure
- BNS 16 – asphalt layer: d = 7cm
- Base layer of buffer layer under the roadway: 30 cm
The subject street is part of Т4D5.The work is being carried out by the construction DPTU ЕSKAVATORI – MK Dooel Skopje. The value of the signed contract is 1,818,850 denars.
Project Overview
Preparatory work:
- Securing and marking the route
Lower and upper structure:
- Mechanical excavation of earth in a wide excavation 3-4 floors.
- Making subsoil/ bedding
- Making an embankment (improved bedding 15 cm)
- Leveling existing manholes
- Installing a buffer layer (under the roadway)d=30см
- Installation of BNHS 16 layer d=7см.
- Construction of banks 0.5 cm
Traffic signals:
- Installation of traffic signs
Total road length: L = 143 m
- Design speed: 30 km/h
- Road profile width: 3.50 m
Pavement Structure
- BNS 16 – asphalt layer: d = 7cm
- Base layer of buffer layer under the roadway: 30 cm
The subject street is part of Т4D5.The work is being carried out by the construction DPTU ЕSKAVATORI – MK Dooel Skopje. The value of the signed contract is 1,043,326 denars.
Project Overview
Preparatory work:
- Securing and marking the route
Lower and upper structure:
- Mechanical excavation of earth in a wide excavation 3-4 floors.
- Making subsoil/ bedding
- Making an embankment (improved bedding 15 cm)
- Leveling existing manholes
- Installing a buffer layer (under the roadway)d=30см
- Installation of BNHS 16 layer d=7см.
- Construction of banks 0.5 cm
Traffic signals:
- Installation of traffic signs
Total road length: L = 330 m
- Design speed: 30 km/h
- Road profile width: 3.50 m
Pavement Structure
- BNS 16 – asphalt layer: d = 7cm
- Base layer of buffer layer under the roadway: 30 cm
The subject street is part of Т4D5.The work is being carried out by the construction DPTU ЕSKAVATORI – MK Dooel Skopje. The value of the signed contract is 2,702,977 denars.
Project Overview
Preparatory work:
- Securing and marking the route
Lower and upper structure:
- Mechanical excavation of earth in a wide excavation 3-4 floors.
- Making subsoil/ bedding
- Making an embankment (improved bedding 15 cm)
- Leveling existing manholes
- Installing a buffer layer (under the roadway)d=30см
- Installation of BNHS 16 layer d=7см.
- Construction of banks 0.5 cm
Traffic signals:
- Installation of traffic signs
Total road length: L = 131.7 m
- Design speed: 30 km/h
- Road profile width: 4.00 m
Pavement Structure
- BNHS 16 – asphalt layer: d = 7cm
The subject street is part of Т4D5.
The work is being carried out by the construction DPTU ЕSKAVATORI – MK Dooel Skopje. The value of the signed contract is 1,243,287 denars.
Project Overview
Preparatory work:
- Securing and marking the route
Lower and upper structure:
- Mechanical excavation of earth in a wide excavation 3-4 floors.
- Subsoil / bedding production
- Embankment preparation (improved bedding 15cm)
- Leveling of existing manholes with replacement of covers
- Installation of buffer layer (under the roadway) d=30cm
- Installation of BNHS 16 layer d=7cm
- Construction of shoulders 25cm
Traffic signals:
- Installation of traffic signs
Additional quantities:
- Concrete curbs 18/24 (on the left side) for gutter
- One side curb 50cm